ImageGallery

28 MXS
Staff Sgt. Joseph Canet, 28th Maintenance Squadron crew chief, removes the saddle panel of a B-1B Lancer during an isochronal inspection here, June 16. An average isochronal inspection is performed in 15 days and involves inspecting and reinstalling approximately 1,000 panels. (U.S. Air Force photo/Airman 1st Class Matthew Flynn)

Download Image: Full Size (1.17 MB)
Tags: People
Photo by:  |  VIRIN: 090616-F-4321F-066.JPG