PANJSHIR, Afghanistan -- Capt. Jason M. Aftanas, Panjshir Provincial Reconstruction Team engineer, inspects a brick for the wall for a tashnab (bathroom) at the Pukh High School construction site April 1. Pukh High School is a two-story, 16-room, reinforced concrete structure that will accommodate up to 3,000 students. (U.S. Air Force photo/ Capt. Jillian Torango)