Photos

Keyword: Category: Tag: Sort By:
Quinn Construction and Complete Contracting Solutions workers prepare to excavate concrete slabs from B-1 parking spots during flighline reconstruction project at Ellsworth Air Force Base, S.D., Aug. 5, 2013. Three rows of aircraft parking spots will be renovated to ensure the integrity of Ellsworth’s aircraft parking area. (U.S. Air Force photo by Airman 1st Class Alystria Maurer/Released)


Flightline concrete repair

Quinn Construction and Complete Contracting Solutions workers prepare to excavate concrete slabs from B-1 parking spots during flighline reconstruction project at Ellsworth Air Force Base, S.D., Aug. 5, 2013. Three rows of aircraft parking spots will be renovated to ensure the integrity of Ellsworth’s aircraft parking area. (U.S. Air Force photo by Airman 1st Class Alystria Maurer/Released)

Related Imagery
Airman st Class Alystria MaurerReleased
130805-F-CC568-116.JPG

DOWNLOAD PHOTO
(1.75 MB)



Tags
people, 28th MSG, 28th CES



< Back to Main Gallery

Top Links

Special Links

 

jet shadow
Next Warrior Flyby
1:34 P.M., Fri. May 19



jet shadow
Next Ellsworth Fire Department Live Fire Training

TBD