As the moon shone over Ellsworth Air Force base, Sept. 16, Airmen of the 28th Bomb Wing began processing through the PRIDE Hangar during the final operational readiness exercise before the operational readiness inspection, Oct. 12 through 18. The ORI will be stacked with more than 300 graded items,